Innova’s experienced engineers use state-of-the-art software to deliver world class quality in transportation solutions. Advanced modeling tools are routinely used to analyze structures and propose solutions to our customer to devise the most cost effective solution to a particular project.

Waikoloa Boggie Design
Waikoloa, Hawaii, U.S.

Hoover Dam Bypass - Arch Form Verification
Nevada and Arizona Borders, U.S.

 

The Colorado River Bridge is the central portion of the Hoover Dam Bypass project. Construction on the nearly 2,000-foot long bridge began in late January 2005 and the entire Hoover Dam Bypass Project was completed in August 2012.  

 

Las Vegas Monorail - Structural On-Call Services
Las Vegas, Nevada, U.S.

Mr. Banchik was the engineer in charge of the design and construction support of the MGM-Bally’s Monorail and then the Las Vegas Monorail project in Las Vegas, NV.

After the project was commissioned, Innova has been involved in numerous tasks in support of the operations for the Las Vegas Monorail as follows:

Las Vegas Monorail - Expansion Studies
Las Vegas, Nevada, U.S.

Mr. Banchik was the engineer in charge of the design and construction support of the MGM-Bally’s Monorail and then the Las Vegas Monorail project in Las Vegas, Nev. After the project was commissioned, and after starting , Innova has been involved in numerous tasks in support of planning for potential expansions of the Las Vegas Monorail as follows:

Monorail Vila Prudentes - Tiradentes
S
ão Paulo, Brazil

Desert Rose Golf Course is located in Las Vegas, Nevada. The steel truss pedestrian bridge is located on the south end of the property. The bridge is used by golfers driving carts to gain access to different holes on the course.