LAS VEGAS RAIDERS ALLEGIANT STADIUM
In December of 2019, Union Erectors and Innova Technologies teamed up with Prismview and Summit Swing Stage to design, fabricate, and install a state-of-the-art, 365’ long x 80’ tall video board to the east side of Allegiant Stadium.
Union Erectors and Innova were responsible for developing a structural frame that would support the video board from only 27 pre-set locations, and it all had to fit within a 24” projection from the building façade and inside a decorative eyebrow feature that forms the frame for the board. These constraints placed the structural frame within 4” of the glass façade! Once our portion was installed, Prismview and Summit worked with Union Erectors to hang the video board panels.
While logistics of the job were daunting, the team proved to be extremely flexible, switching erection methods and sequences to allow for the site civil work to progress. The Las Vegas Raiders were equally flexible; accepting schedule changes to facilitate everyone’s work. This project was truly a team effort.
We want to thank everyone involved with adding this feature element to the newest jewel of the Vegas Valley. We also want to thank John Hershberger and his team at Union Erectors for their creativity and tireless work ethic to make this challenging design a reality!